Answer the 2 of this questions:1- Conceptual Estimate• Submitting a text entry box or a file upload• Estimate the cost of a 25,000 sf warehouse building in Lansing. Several similar buildings have been constructed in the last several years in the same location. Two years ago, a small 20,000-SF structure was completed for $3,400,000. What is the estimated cost for the new warehouse? (80%)• What would the cost of the building be in Las Vegas? (20%)• Hint: Follow the example in the presentation.2- Loader Production• Submitting a text entry box or a file upload• Estimate the minimum and the best production in ton per hr for a track loader using a 4.00 cyd general purpose bucket. The loader is being used to stockpile dry earth. Efficiency: assume a 55 min-hr. (70 % of the credit)• Check for tipping (Tables 9.8 & 9.9 provide info) (10%).• How many days are needed to stockpile 24,000 lcy of earth ( the loader works 8 hours a day) when the loader is at minimum and best production. ( 10%)• If the loader’s O&O cost is $160.00 per hr and the operator’s cost is $58.00 per hr. What is the unit cost ( $ per lcy) (10%)•and I will put the files.
Last Completed Projects
| topic title | academic level | Writer | delivered |
|---|