The below paragprah explains what is expected. All information must be Australian based preffered to also be the state NSW based. must be citation, diagrams, photogrpahs etc..
Those using reference to research and/or manufacturers’ literature and recommendations
You will start by undertaking a broad investigation into new or revised services systems that are under
investigation or newly introduced into building and construction. If we look at (say) electrical services as
an example, it might be that you would be interested in alternative ways to provide base-load power to a
project. We presently rely on coal fire power in NSW which is distributed from source of generation in The
Hunter Valley, via high voltage cabling and transformed to lower voltage for our buildings and facilities. You
may be inclined to look at the alternatives such as the various generating systems that are property or
estate based. Cogeneration and trigeneration plants come to mind and it would be appropriate for a
Page 3 of 4
study on the offerings available at present and the future technologies that are being investigated and
trialled. It would be expected that the specifics of the system would be detailed (including the manufacturer);
how it would be located (or co-located) on site (including the physical area in m2 of the location); how long
the lead-time for manufacture and delivery and any particular idiosyncrasies regarding delivery and
placement (such as specialist craning etc). Your photographic and diagrammatic references would come
from the literature or the manufacturer including appropriate referencing. Commentary would hopefully
include recommendations as to the benefits of the system and this would include immediate and the longerterm (life-cycle) benefits.
Last Completed Projects
| topic title | academic level | Writer | delivered |
|---|
