Discuss the resources required to execute the proposed plan Name the document “yourname_IT425_IP5.doc.”

Assignment Details:
System integration and deployment is the last stage in the Software Development Life Cycle. It is important to have a support and maintenance plan to continue supporting the application when it is in operation.
In this assignment you will craft an integration and deployment plan for your selected application or system that includes the required resources and work breakdown structure of implementation tasks (you may use the Visio software application where needed).
The project deliverables are as follows:
Integration and Deployment Plan

Discuss the resources required to execute the proposed plan
Name the document “yourname_IT425_IP5.doc.”
Individual Project Rubric
The Individual Project (IP) Grading Rubric is a scoring tool that represents the performance expectations for the IP. This Individual Project Grading Rubric is divided into components that provide a clear description of what should be included within each component of the IP. It’s the roadmap that can help you in the development of your IP.

Expectation Points Possible Points Earned Comments
Integration and testing: Students are expected to list the activities needed for system integration
25
Acceptance, Installation and Deployment: Students are expected to list the activities needed for system installation and deployment
25
Support and Maintenance: Students are expected to list the activities needed to support and maintain the system
25
Resources: Students are expected to identify resources required to execute the deployment plan
25
Organization: Assignment presents information logically and is clearly relevant to discussion topic.
15
Professional Language: Assignment contains accurate grammar, spelling, and/or punctuation with few or no errors. (APA formatting is required or style specified in assignment).
10
Total Points
125
Total Points Earned

Last Completed Projects

topic title academic level Writer delivered