1. The Executive Summary (pages ES1 & ES2), and Chapters 1 and 2 (pages 113) [Note: in Acrobat these are pages 1125] of the Contingency Planning Guide for Information Technology Systems (Links to an external site.)
link: https://csrc.nist.gov/publications/detail/sp/800-34/rev-1/final
2.from the National Institute of Standards and Technology, 2010.
3. Review, in particular, the list under Technology/Management.
4. Governing Information Technology Risk , by Parent and Reich, California Manag
————————————————————————————–
Read the material on contingency planning, disaster recovery plans, and governing risk to prepare yourself for this assignment, in which you will assess and critic a disaster recovery plan. Disaster recovery plans typically include this content:
Identification of the most critical systems
Impact analysis of systems outage, with the maximum amount of time the organization can survive with systems down
Risk assessment of the probability of disasters
Identification of missioncritical systems, their files, and location of backups
Action plan for handling missioncritical systems in the event of an outage
Procedures to follow during and after a disaster (recovery)
Schedule for testing the disaster recovery plan
Evidence of management support and funding for disaster recovery planning
——————————————————————————————-
Use the DR plan and description of an organization provided to you for this assignment –
attached: TXA&MITDisasterRecoveryPlan.pdf
1. Describe the process (steps) you would use in any organization to develop and deploy a business continuity and disaster recovery plan.
2. Critically review the Texas A&M plan provided and suggest ways to improve, note any missing elements, and provide any other suggestions you have for the development team. This assessment and process description should be no more than 3000 words. Please cite any material
using MLA style if necessary.
Last Completed Projects
| topic title | academic level | Writer | delivered |
|---|
