1. Describe the scope of the project and control measures.
2. Describe the goals and objectives of the project.
3. Give a detailed, realistically estimated cost analysis of the entire project, including technical resources (human capital) that
may be needed to complete the project.
4. Relate the value of the project plan solution to the competitive advantage that information technology will afford the
organization.
5. Provide all aspects of the information technology implementation into the project plan.
6. Recommend solution providers who can assist with development and implementation. Include a cost analysis of at least
three providers.
2. Combine all previous documentation for Project Deliverables 1–5 in which you:
1. Provide all aspects of the information technology implementation into the project plan.
2. Revise the documentation based on feedback from the earlier evaluation of the deliverable.
3. Use at least five quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
This course requires the use of Strayer Writing Standards. For assistance and information, please refer to the Strayer Writing
Standards link in the left-hand menu of your course. Check with your professor for any additional instructions.
Section 2: Revised Business Requirements Document
Document all revisions made to the written project plan in the Document Control section of the business requirements document
from Project Deliverable 2: Business Requirements. Note: This documentation must outline the revisions made to the previous
deliverables required in Section 1: Written Project Plan.
Section 3: Project Plan PowerPoint Presentation
Additional to your detailed executive summary, you must present your findings to the executive team and the venture capital group;
that, along with the executive summary, will convince the group that your solution is optimal.
Create a 10–15 slide PowerPoint presentation in which you:
1. Illustrate the concepts from the executive summary in Section 1 of this assignment.
2. Create bulleted speaking notes for your presentation to the executive board in the Notes section of the PowerPoint. Note: You
may create or assume any fictitious names, data, or scenarios that have not been established in this assignment for a realistic
flow of communication.
3. Use a professional technically written style to graphically convey the information.
Section 4: Finalized Project Plan
Use Microsoft project to:
1. Finalize your project plan from Project Deliverable 5: Network Infrastructure and Security to include all necessary changes in
assumptions, tasks, and subtasks.
The specific course learning outcome associated with this assignment is:
Develop a comprehensive project plan proposal
Last Completed Projects
| topic title | academic level | Writer | delivered |
|---|
