Explain how ERP could be operated (management process, who should be responsible, numbers of different users of each module, data accuracy, etc.) within the chosen firm

Integrated Learning Project Assignment Expectations
Each
component, from part 3 will be the development of an Enterprise Resource
Planning (ERP) module in Excel relevant to the topic for that part. The
Excel development will follow SAP and other ERP systems formats. The Excel
file will be accompanied by a written assignment containing:

Details on
how this ERP assignment could be implemented (assignment management
process, who should be involved, and why, etc.) within the chosen firm
(min 300 words)
Details on
how ERP could be operated (management process, who should be responsible,
numbers of different users of each module, data accuracy, etc.) within
the chosen firm (min 300 words)
What could
be the future sources of inaccuracy in the data contained the ERP system
(min 300 words)
How the
corruption of the data could be prevented (min 300 words)
An analysis
and composition of the net benefit (benefits minus costs linked to income
statement and balance sheet) of the implemented ERP system

The
assignment will include various parts that consist of Master Production
Schedule, Bill of Materials, Materials Requirements Planning, Capacity
Planning, Distribution Requirements Planning and Shop Floor Control. The
Excel file will be submitted simultaneous with the following written
report. The total course report would be about 3,000 words (excluding
references and appendices).

The
submission will also include a written management report detailing (1) a
recommendation for implementation based on a cost / benefits analysis (2)
implementation assignment plan with responsibilities, (3) a justified
recommendation for an ERP system (e.g. SAP, or other) and its operation
(local or cloud processing, scope of application (national, global, etc.)

Instructions (Please follow the instruction below)
Part 1 – Company (Nike) selection –
Characteristics – Manufacturing – Publicly available financial accounts –
consumer or industrial product. Structure your assignment as follows (word
counts are minimums):
o
Title
page
o
Company
description (300 words)
o
Financial
trends: Overview of inventory types/trends/productivity (trends in day’s stock
by type, Etc.) (300 words)
Income statements
(last 3 years) (300 words)
Balance sheet
(last 3 years) (300 words)
o
Opportunities
for logistics to improve income statement (consider revenues and operating
costs) and balance sheet asset productivity. Provide quantitative calculations
and probable range of costs / benefits. (300 words)
Part 2 –
Master Production Scheduling (MPS) – Develop
an Excel based Master Production Schedule for your chosen product. Use
the format and logic as shown in the illustrative Excel spread sheet to be
found under Course Content. Also review the Kaptur presentation for this part,
as well as pages 281 through 303 in your Logistics textbook. Your MPS Excel
file will be accompanied by a written assignment containing:

Details
on how this module could be implemented (assignment management process,
who should be involved, and why, etc.) within the chosen firm (300 words)
Details
on how this module could be operated (management process, key factors in
the MPS policy, who should be responsible and why, the users of this
modules data, etc.) within the chosen firm (300 words)
What
could be the future sources of inaccuracy in the data contained in the
module (300 words)
A
comparison of any 2 MPS schedule formats and logic taken from
http://www.softwareadvice.com/erp/?more=true#more or other MPS types from
your own research of available MPS software (300 words)

Part 3 –
Enterprise Resource Planning – Develop
an Excel analysis of the modules and functionality of 3 ERP systems, one of
which must be SAP and the other 2 are of your choice. Follow the “ERP Links”
for a listing of over 100 ERP software systems, including SAP (https://www.softwareadvice.com/erp/?more=true#more).
Overlay the functionality of these ERP systems onto the main manufacturing
processes of your selected firm and determine which software best fits your
chosen company. Your Excel analysis will accompany your written assignment
which will contain:

Description
of the how the software selection criteria (and which ones) were chosen
for your company (300)
An
analysis and tabulation of the strengths and weaknesses of the main
modules of each software solution when compared of your selection
criteria (300)
A
discussion of any ancillary data capture equipment and other software
that may be advantageous to the operation of the ERP system in your
company (300)
Consideration
of which functional areas would be responsible for the operation of each
of the major ERP modules (300)
An
analysis of the possible software costs of your recommended ERP software
(300)

Part 4 –
Materials Requirements Planning – Develop
an Excel based Materials Requirements Plan for your chosen product. Use the
format and logic as shown in the illustrative Excel spread sheet to be found
under Course Content. Show at least 4 MRP levels with sub-assemblies, purchased
components, manufactured components, and raw materials. Review the Kaptur
presentation for this part, as well as pages 233 through 305 in your Logistics
textbook. Your MRP Excel file will be accompanied by a written assignment
containing:

Details
on how this module could be implemented (assignment management process,
who should be involved, and why, etc.) within the chosen firm (300 words)
Details
on how this module could be operated (management process, key factors in
the MRP operating policy, who should be responsible and why, the users of
this modules data, etc.) within the chosen firm (300 words)
What
could be the future sources of inaccuracy in the data contained in the
module (300 words)
A
comparison of any 2 MRP schedule formats and logic taken from
http://www.softwareadvice.com/erp/?more=true#more or other MRP types from
your own research of available MRP software (300 words)

Part 5 –
Distribution Requirements Planning – Develop
an Excel based Distribution Requirements Plan for your chosen product. Use the
format and logic as shown in the illustrative Excel spread sheet to be found
under Course Content. Show at least 4 distribution warehouses with 4 components
planned for each with at least 1 common to all distribution warehouses. Review
the Kaltura presentation, as well as pages 319 through 406 in your Logistics
textbook. Your DRP Excel file will be accompanied by a written assignment
containing:

Details
on how this module could be implemented (assignment management process,
who should be involved, and why, etc.) within the chosen firm (300 words)
Details
on how this module could be operated (management process, key factors in
the DRP operating policy, who should be responsible and why, the users of
this modules data, etc.) within the chosen firm (300 words)
What
could be the future sources of inaccuracy in the data contained in the
module (300 words)
A
comparison of any 2 DRP schedule formats and logic taken from
http://www.softwareadvice.com/erp/?more=true#more or other DRP types from
your own research of available MRP software (300 words)

Part 6 –
Capacity Requirements Planning – Develop
an Excel based Capacity Requirements Plan for your chosen product. Use the
format and logic as shown in the Integrated Learning Project Example found on. Review
the Kaptur presentation for this part, as well as pages 439 through 478 in your
Logistics textbook. Your CRP Excel file will be accompanied by a written
assignment containing:

Details
on how this module could be implemented (assignment management process,
who should be involved, and why, etc.) within the chosen firm (300 words)
Details
on how this module could be operated (management process, key factors in
the CRP operating policy, who should be responsible and why, the users of
this modules data, etc.) within the chosen firm (300 words)
What
could be the future sources of inaccuracy in the data contained in the
module (300 words)
A
comparison of any 2 CRP schedule formats and logic taken from ERP
Software or other CRP types from your own research of available CRP
software (300 words)

Part 7 – Assignment Plan – Develop a time phased assignment plan for the
implementation of an ERP system at your selected firm. Review the assigned
Learn material, as well as pages 511 through 551 in your Logistics textbook.
Your time phased assignment plan Excel file will be accompanied by a written assignment
containing:

Overall
structure of the ERP implementation plan detailing responsibilities and
timing (300 words)
Details
on the Education and Training activities of the plan, their sequencing
and timing (300 words)
Details
on the key activities in the Bills of Materials sub-assignment to achieve
a company document with 98% accuracy (300 words)
Details
on the key activities in the Warehouse sub-assignment to achieve a
minimum of 95% accuracy (300 words)
Details
on the key activities in the Master Production Schedule sub-assignment to
achieve a 98% customer service accuracy (300 words)

Part 8 – Concluding
Part
(1) A recommendation
for implementation based on a cost / benefits analysis (2) Implementation
assignment plan with responsibilities
(3) A justified
recommendation for an ERP system (e.g. SAP, or other) and its operation (local
or cloud processing, scope of application (national, global, etc.)

Last Completed Projects

topic title academic level Writer delivered