idea:
increase in number of Maintenance CM and PM in the metro stations ….. ( Counting the number of maintenance and emergency maintenance in the 47 metro station in Dubai in a periode of time and the Correcting maintenance and make it same as the sample
i attached a sample of the assignment and make it the similar with my idea)
Requirements:
Problem statement : detail the proposed idea
• Short Introduction and Background (half a page 200-300 words)
• Related literature (half a page or 200-300 words)
• Descriiption of the Arena simulation model
• Simulation detail (Doe(s)) and the animation that comes with the model. (describe and
discuss the statistics)
• Discuss of simulation results (how the simulation had helped in exploring the solution)
• Conclusion (half a page 200-300 words)
• References
Last Completed Projects
| topic title | academic level | Writer | delivered |
|---|
